The Glitch

Overview: A project requires both medium- and low-temperature radiant floor panels. The installer proposes the following system design. Since the mod/con boiler already has an internal outdoor reset controller, he decides to use a standard 1-inch tempering valve to lower the water supply temperature to the lower temperature zones. He also decides that since the boiler supply and return connections are 1 inch, he can pipe the entire system with 1-inch tubing.

Exercise: Can you spot at least six design or installation details that are going to create problems?

The Fix

The header piping in the original design is the same size (1-inch) as the piping to individual zone circulators. This will likely create a high pressure drop when all zone circulators are operating. The pipe size of the distribution headers in the fix drawing has been increased to minimize head loss and, thus, minimize hydraulic interference between zones.

The boiler circulator needs to be hydraulically separated from the circulators in the distribution system. This has been corrected using the closely spaced tees.

The 1-inch tempering valve with Cv = 3.0 has been replaced with a properly sized three-way rotary mixing valve with much higher Cv (Cv = 10) and hence lower pressure drop. Although a motorized actuator is shown on the mixing valve, it may not be required.

A manually set (nonthermostatic/nonmotorized) three-way valve can provide proportional reset control to the lower temperature zones when the hot water supplied to the valve is reset by the boiler. The motorized actuator is recommended in situations where the lower temperature zones will have frequent setback or temperature adjustment. A check valve is installed in the hot water pipe to the three-way valve to prevent flow reversal when other zones are operating.

The remaining glitches and their corrections are as follows:
  • A microbubble air separator has been added such that flow from the boiler passes through it during both space heating and DHW operating modes.  

  • In the original drawing, the purging valves on the return side of the zone circuits were installed backwards.  

  • In the original drawing, all zone circulators are shown with very little distance between their inlet port and the header. This distance should be a minimum of 12 pipe diameters to reduce the level of turbulence entering the circulator.  

  • The DHW circulator in the original drawing lacks a check valve. Without it, there will be some reverse flow through the coil of the indirect water heater when the space-heating portion of the system is operating.  

  • Finally, the point of no pressure change in the original system is incorrectly located on the discharge side of the circulators.


Links

Did you enjoy this article? Click here to subscribe to receive Radiant and Hydronics eNewsletter twice a month, delivered right to your inbox. 

Recent Articles by John Siegenthaler, P.E.

You must login or register in order to post a comment.

Multimedia

Videos

Image Galleries

2013 QSC Power Meeting XXXVIII

March 14-16, 2013, San Diego

Photos by Kelly Faloon/Plumbing & Mechanical

8/26/14 1:00 pm EST

Free Webinar: Low Temperature Heat Emitter Options in Hydronic Systems

With proper design, you can create systems that require supply water temperatures no higher than 120° F under design load conditions.

Radiant and Hydronics eNews

august cover

2013 August

In the August edition of Radiant & Hydronics, read about new technology in measuring energy, NASCAR driver Ryan Newman and State Water Heaters new partnership and Bradford White's newest apps. Also check out the latest products in the heating and cooling industry.

Table Of Contents Subscribe

Back to School

View Results Poll Archive

The Radiant and Hydronics Store

M:\General Shared\__AEC Store Katie Z\AEC Store\Images\radiant hydronics\HydronicsKnowHowII_CD.gif
Hydronics Know How II CD

The Hydronics Know How II CD contains all the columns and articles John Siegenthaler has written for Plumbing & Mechanical and PM Engineer, from the very first in July 1996 through December 2008. That’s over 200 articles and columns covering everything from heat loss to hydraulic separation.

More Products

Clear Seas Research

Clear Seas ResearchWith access to over one million professionals and more than 60 industry-specific publications, Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Radiant Flooring Guide

Radiant flooring guide 2013Your Guide to suitable floor coverings and submaterials for use with radiant heating. CLICK HERE to read the latest edition of Radiant Floring Guide.

STAY CONNECTED

Facebook logo Twitter logo    YouTube logo      linkedin_40px.png