Process Cooling
  Home
  Subscribe
  eNewsletter
  Online
  Calendar of Events
  Blog
  How To Corner
  Current
  Industry News
  Company News
  Did You Know...
  Online Now
  New Products
  The Glitch & The Fix
  Resources
  AEC Store
  Archives
  Career Center
  e-News Archives
  Industry Links
  Market Research
  Radiant Flooring Guide Directory
  Digital Radiant Flooring Guide
  Radiant Heating Report
  Solar Thermal Report
  R+H Info
  About Us
  Contact Us
Search in: EditorialProductsCompanies

Converting A Two-Pipe Steam System
by John Siegenthaler, P.E.
July 19, 2010

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare



The Glitch

Overview: An old New England home has been heated with a two-pipe steam system serving plenty of sturdy cast-iron radiators. As part of an extensive renovation and insulation upgrade, the owner decides to upgrade the heat and convert the system to a high-efficiency, gas-fired condensing boiler. The piping system installed by the local plumber is shown below. It leaves as much of the two-pipe distribution in place as possible.  

Exercise: What are some design details that you think are incorrect or missing?


The Fix

Over decades of use, lots of “mud” can build up in a steam heating system with cast-iron radiators. It’s really a shame to push that mud into new portions of the system, and especially into the compact heat exchanger of the new boiler. I’d recommend a high-quality dirt separator on the receiving end of the flowing mud, and installed at a low point in the piping whenever possible.  

Be sure to leave room for a blow-down valve at the bottom because you are sure to be using it. Also be sure the flow velocity into the dirt separator is at or less than 4 feet per second. A hydraulic separator could also be used in place of the closely spaced tees, air separator and dirt separator.  

Another problem is the arrangement of the circulator in the boiler loop. It should be pumping into the condensing boiler (because the latter has a high-flow-resistance heat exchanger).   

Other details that are incorrect:   

  • If you expect hydraulic separation between circuits, do not install closely spaced tees as shown in the Glitch drawing. Instead, provide a minimum of 6 pipe diameter of straight pipe both upstream and downstream of the closely spaced tees.  
  • There should always be a good microbubble air separator on the outlet of the boiler.  
  • In the Glitch drawing, the circulator is at the low point of the distribution system — the most probable location for sediment to collect.  
  • Install an air vent on each radiator.


  • John Siegenthaler, P.E.
    john@hydronicpros.com
    John Siegenthaler, P.E., is principal of Appropriate Designs, a consulting engineering firm in Holland Patent, N.Y., and author of the text “Modern Hydronic Heating.” Visit www.hydronicpros.com for information on new software for hydronic system design and documentation. John is also the contributing editor to PM's monthly "The Glitch & The Fix" column, which offers hydronic troubleshooting solutions in conjuction with the magazine's twice-monthly Radiant & Hydronics eNews newsletter. You can reach John by e-mail at john@hydronicpros.com.